House extension architects in London: what changes borough by borough
In London, whether an extension needs a planning application depends on your borough, your street and whether you own a house or a flat. This page covers the London specifics: conservation areas, Article 4 directions, terraced-house layouts and party walls.
London at a glance
Planning decisions are made by 32 London borough councils + the City of London Corporation (33 local planning authorities). London has 33 planning authorities (32 boroughs and the City of London); the planning figures below add them together.
- Householder decisions made in time (our calculation from the published counts)
- 93.5%
- MHCLG, 1 July 2025 to 30 June 2026 (four quarters)
- Homes built before 1919
- 28.9%
- Valuation Office Agency, 31 March 2026 (England and Wales Council Tax valuation lists)
Checked against the linked sources on 14 October 2026 · London (England), planning rules and council pages as read on 14 October 2026
A house extension in London is any addition to a home, such as a rear room, a side-return infill or a wraparound of both. The design questions are the same as anywhere. The approval questions are not, because boroughs layer their own rules over the national ones. Start with the council that covers your postcode, which GOV.UK's council finder will give you, then work out which of the three routes below applies. Our London hub guide covers the wider borough picture, and the national extensions page explains the routes themselves.
Does a London conservation area change the answer?
It usually does. The Planning Portal's extensions page lists conservation areas as article 2(3) land, and on that land every side extension needs householder permission, as does any rear extension of more than one storey (Planning Portal). The 6 metre prior approval route for a larger single-storey rear extension is also unavailable there (GPDO Schedule 2 Part 1). So a deep ground-floor extension that a house in a non-designated street might build with a neighbour consultation will need a full householder application inside a conservation area.
Boroughs can go further. Islington says it has removed permitted development rights in 40 of its 42 conservation areas (Islington), and Lambeth publishes a dataset of its Article 4 directions that you can download (Lambeth). These directions often target front-facing changes, but you should read the direction itself, because the list of restricted works differs between areas.
| Situation | Likely route | What to check |
|---|---|---|
| House outside a conservation area, rear extension within 3 metres (4 metres if detached) | Permitted development, optionally with a lawful development certificate | Article 4 directions, height and materials limits |
| House outside a conservation area, deeper single-storey rear extension up to 6 metres (8 detached) | Prior approval from the borough | Neighbour comments during the consultation |
| House in a conservation area, side or two-storey rear addition | Householder application | Borough design guide and conservation area appraisal |
| Flat or maisonette | Full planning application, plus freeholder consent | Lease terms, building insurance, managing agent |
What does a typical London terrace mean for the design?
About 28.9% of London's dwellings were built before 1919 (VOA), and many of the houses among them are narrow terraces with a back addition and a side passage. That plan shapes the usual London brief. A side-return infill fills the gap beside the back addition. A wraparound combines that with a rear extension. Both change daylight to the neighbour's kitchen window, and councils tend to test the effect on neighbours' outlook closely, so a drawing that shows the 45-degree line to the nearest window earns its keep.
Where the borough publishes householder guidance, it is the document officers will hold your design against. Camden, for example, publishes planning guidance on home improvements, dated January 2021, and Kensington and Chelsea has a Basements SPD adopted on 14 April 2016 for the subterranean variant (Camden planning guidance; RBKC; Camden basement guidance). A garden-level lower-ground extension can count as basement development under some boroughs' policies, which brings engineering reports with it. Ask your architect which document governs your own street.
How does the Party Wall Act affect an extension?
Most London extensions touch a shared wall, build up to a boundary or dig foundations near a neighbour. Each of those can bring the Act into play. The Government's booklet says notice for work to a party structure is due at least two months before the planned start, and one month for certain excavations (GOV.UK). If a neighbour dissents, surveyors prepare an award, which adds cost and time. Plan the notice at the same time as the planning application, not after the approval letter arrives. Our party wall page explains the process.
Extensions in London: the figures
| What | Figure | Source |
|---|---|---|
| Householder decisions across London's 33 authorities | 23,967 in the year to 30 June 2026 | MHCLG, Live tables on planning application statistics: District planning application statistics (PS2), last 4 quarters to 30 June 20261 July 2025 to 30 June 2026; published 24 September 2026 |
| Householder decisions granted in London | 85.8% | MHCLG, Live tables on planning application statistics: District planning application statistics (PS2), last 4 quarters to 30 June 20261 July 2025 to 30 June 2026; our calculation from the published counts |
| London homes built before 1919 | 28.9% of dwellings | Valuation Office Agency, Council Tax: stock of properties 2026, Table CTSOP4.0, London regionAt 31 March 2026; published 24 September 2026 |
| Single-storey rear extension without an application | No more than 4 metres beyond the rear wall for a detached house, or 3 metres for any other house | Planning Portal, Extensions: planning permissionPage read 14 October 2026 |
| Extensions of more than one storey in a conservation area | Householder planning permission is required for all rear extensions of more than one storey | Planning Portal, Extensions: planning permissionPage read 14 October 2026 |
| Side extensions in a conservation area | All side extensions require householder planning permission | Planning Portal, Extensions: planning permissionPage read 14 October 2026 |
| Larger single-storey rear extension (prior approval) | 6 metres (8 metres if detached), but only where the house is not on article 2(3) land, which includes conservation areas | legislation.gov.uk, GPDO 2015 Schedule 2 Part 1, Class A.1(g)Order as amended, read 14 October 2026 |
| Planning fee for altering or extending one home in England | £548 for a householder application on a single house; a full application to alter a single flat is also £548 | Planning Portal, Application fees for EnglandApplies from 1 April 2026 |
| Notice for work to a party structure | At least two months before the planned start date | GOV.UK, The Party Wall etc. Act 1996: explanatory bookletBooklet read 14 October 2026 |
What does the council cost and how long does it take?
A householder application for a single dwelling costs £548 from 1 April 2026 (Planning Portal fee guide). London's authorities decided 23,967 householder applications in the year to June 2026 and granted 85.8% (MHCLG). Those are totals for 33 authorities, so look up your own borough's decision history in its online planning register to see how similar schemes on your street fared. Pre-application advice is a separate, optional charge in many boroughs; Richmond upon Thames, for instance, runs a written service for non-listed homes without an officer meeting (Richmond).
Could the extension go down instead of out?
Some London owners with small gardens look at a lower-ground floor or basement instead of a rear addition. Boroughs treat this as a distinct category. Camden asks for technical assessment of drainage, groundwater and structural stability with basement applications, and Kensington and Chelsea has its own supplementary document, so the engineering input starts before the planning submission rather than after it. Expect longer lead times and a larger consultant team than for a ground-floor extension, and ask your borough for its basement checklist before you decide the idea is affordable.
How should you sequence the approvals?
A sensible London order is to settle the designations first, agree a brief and budget, test the idea with the planning team if the borough sells pre-application advice, and only then commission the full drawings. Building regulations drawings and party wall notices follow the planning decision, although the notice can be served earlier if the design is stable. Skipping the early check is the most common way a London owner pays for detailed drawings of a scheme that the borough's guidance would never have supported.
What should you ask an architect before hiring?
- Which borough guidance applies to my street, and which approval route do you expect me to need?
- How will you handle neighbours' daylight and outlook, and when will you show me that analysis?
- Do you include party wall advice, or do I need to appoint a surveyor separately?
- What is in your fee for each stage, and what is excluded, such as structural engineering or the council's fee?
- Can you show me comparable decisions from the same borough on its planning register?
Check any architect you shortlist on the ARB's register of architects before you sign terms. Our guide to costs explains how fees are built up, and the blog post on planning permission for extensions covers the national rules in more depth.
Questions people in London ask
Do I need planning permission for a rear extension in London?
Not always. A house outside a conservation area may be able to build a modest single-storey rear extension under permitted development, but flats cannot, and boroughs can remove the rights with Article 4 directions. Check the borough's conservation area and Article 4 information, then get written confirmation or a lawful development certificate.
Can I do a side-return extension without planning permission?
A side extension outside a conservation area may be permitted development if it is single-storey, no more than four metres high and no wider than half the original house. In a conservation area every side extension needs householder permission. Many London side returns are narrow, so the rules on height and boundaries decide the outcome.
How much is a planning application fee for an extension in London?
From 1 April 2026 the fee for a householder application for a single dwelling in England is £548, the same in every London borough. Architects, surveyors and engineers charge separately. Some boroughs also charge for pre-application advice, so ask the council what its current fees are before you budget.
Is a party wall agreement needed for an extension?
It is needed whenever the work falls within the Party Wall etc. Act 1996, such as building on or cutting into a shared wall or excavating close to a neighbour's building. Notice is due at least two months before work to a party structure starts. A neighbour can consent or dissent, and surveyors may then settle the terms.
How do I find my borough's extension design guide?
Search your borough's website for its planning guidance, supplementary planning documents or householder guide, then check its Local Plan policies on design and neighbour amenity. If you cannot find a householder document, ask the planning team which guidance officers use. Your architect should already know it for your area.
Sources
- Live tables on planning application statistics (PS2) (MHCLG, opened 13 October 2026)
- Council Tax: stock of properties 2026 (Valuation Office Agency, opened 13 October 2026)
- Extensions: planning permission (Planning Portal, opened 14 October 2026)
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 1 (legislation.gov.uk, opened 14 October 2026)
- Application fees for England, from 1 April 2026 (Planning Portal, opened 14 October 2026)
- The Party Wall etc. Act 1996: explanatory booklet (GOV.UK, opened 14 October 2026)
- Permitted development (London Borough of Islington, opened 14 October 2026)
- Article 4 directions (London Borough of Lambeth, opened 14 October 2026)
- Pre-application advice (London Borough of Richmond upon Thames, opened 14 October 2026)
- Basements SPD, April 2016 (Royal Borough of Kensington and Chelsea, opened 14 October 2026)
- Basement developments (London Borough of Camden, opened 14 October 2026)
- Planning policy documents (Camden Planning Guidance) (London Borough of Camden, opened 14 October 2026)
- Find your local council (GOV.UK, opened 14 October 2026)
Rules and fees change, so check the linked page before you rely on a figure. Most planning and building rules here are for England; Wales, Scotland and Northern Ireland differ. This page is general information, not professional advice.