Architects for house extensions
An architect takes a house extension from first sketch to approved drawings and, if you wish, through the build. This page explains what that involves in England, which approval route a design is likely to take, and how to choose one who is on the ARB register.
Checked against the linked sources on 13 October 2026 · England, rules and fees as published in October 2026
What does an architect do on a house extension?
An extension architect is a person on the Architects Register who designs an addition to an existing home, prepares the drawings that councils and builders work from, and can guide you through the approvals. On a typical project the work falls into four jobs.
- Design. Turning a brief and a budget into a layout, a roof form and a choice of materials that suits the existing house and garden.
- Drawings. Survey drawings of what is there, then proposed plans, elevations and sections.
- Approvals. Working out which planning route fits and preparing the application or notice.
- Procurement and site. Per the Architects Registration Board, an architect can also obtain quotes from other construction professionals and manage the relationship between you and your builder (ARB checklist).
You can hire an architect for only the first three, or for all four. That choice moves the fee more than anything else, which is why it comes up again in the fees section below.
Which planning route will a rear or side extension take?
Which route a design takes is largely decided by two things: how far it projects and whether the land is designated. The table sets out the four routes for a single-storey rear extension on a house in England.
| Route | When it applies | Council fee | Neighbours |
|---|---|---|---|
| Permitted development | Up to 3m back (4m detached), 4m high, within the other conditions | None | No formal notice |
| Prior approval, larger extension | Over those depths, up to 6m (8m detached); not on article 2(3) land or an SSSI | £249 | Council notifies adjoining neighbours |
| Householder application | Anything beyond the limits, any side extension on designated land, or rights removed | £548 | Council consults in the usual way |
| Lawful development certificate | Optional proof that a scheme is lawful as designed | See the Planning Portal fee schedule | Not applicable |
The limits themselves, and the conditions about eaves, the half-the-land rule and designated land, are set out in our guide to planning permission for a house extension. This page does not repeat them. What an architect adds is judgement at the edges. A scheme that is half a metre over the depth limit can sometimes be reshaped to fit, or deliberately taken down the prior approval route, and a design is only as good as the check made against the original house, which the Planning Portal defines as the house as first built or as it stood on 1 July 1948 (Planning Portal).
What does prior approval add for a larger single-storey extension?
Prior approval is a lighter check than a full application. Under the Order, adjoining owners and occupiers are given notice and their comments are to be received not less than 21 days from the date of that notice. If a neighbour objects, the council goes on to decide whether the effect on neighbouring amenity is acceptable (legislation.gov.uk). The Planning Portal describes the council as consulting adjoining neighbours about the proposal (Planning Portal).
For you, the practical point is time. The notice period and any amenity decision sit in front of the start date, so a project that needs this route should not have a builder booked for the week after submission. An architect who has run these applications will usually have views on how neighbours react to a deep extension and can show the council its effect on light and outlook in the drawings.
Do you need building regulations approval for an extension?
Yes, in most cases, and it is a different approval from planning. A scheme can be exempt from a planning application and still need full technical drawings for building control. On the full plans route the Planning Portal says the council must decide within five weeks, or two months if you agree to the longer period (Planning Portal).
The technical package is where an extension is really specified: foundations, the beam over a new opening in the old rear wall, insulation, drainage and ventilation. Ask each architect who will arrange the structural engineer's calculations and whether their fee includes them, because the answer is often "no" and the cost is separate. The drawings produced at this stage are also what builders price, so loose drawings produce loose quotes.
Extensions in numbers
| What | Figure | Source |
|---|---|---|
| Single-storey rear extension without an application, detached house | Up to 4 metres beyond the original rear wall (3 metres for any other house), and no more than 4 metres high | Planning Portal, Extensions: planning permissionPage read 13 October 2026 |
| Larger single-storey rear extension, prior approval route | Up to 8 metres for a detached house, 6 metres for any other house, not on article 2(3) land or an SSSI | legislation.gov.uk, GPDO 2015 Schedule 2 Part 1, Class A.1(g)Order as amended, page read 13 October 2026 |
| Neighbour consultation window for a larger extension | Comments are to be received not less than 21 days from the date of the notice | legislation.gov.uk, GPDO 2015 Schedule 2 Part 1, paragraph A.4(5)(d)Order as amended, page read 13 October 2026 |
| Council fee, prior approval for a larger home extension | £249 | Planning Portal, A guide to fees for planning applications in EnglandEngland, 1 April 2026 (V2026) |
| Council fee, householder application | £548 for a single dwellinghouse (flats excluded) | Planning Portal, A guide to fees for planning applications in EnglandEngland, 1 April 2026 (V2026) |
| What counts as the original house | The house as first built, or as it stood on 1 July 1948 if built earlier | Planning Portal, Extensions: planning permissionPage read 13 October 2026 |
| Building regulations full plans decision time | Within five weeks, or two months if you agree | Planning Portal, Full plansPage read 13 October 2026 |
| Party wall notice for work to an existing party wall | At least two months before the planned start (one month for excavation within 3 or 6 metres) | GOV.UK, The Party Wall etc. Act 1996: explanatory bookletBooklet read 13 October 2026. England and Wales. |
| Use of the title architect | A criminal offence in business or practice for anyone not listed on the Architects Register | Architects Registration Board, Public informationPage read 13 October 2026 |

When does the Party Wall etc. Act come into an extension?
If the extension touches a shared wall, or digs near a neighbour's foundations, the Act can apply on top of planning and building regulations. The GOV.UK booklet gives two months' notice before work to an existing party wall, and one month before excavation within 3 or 6 metres, depending on the depth (GOV.UK). A side-return extension on a terrace is the usual example. Ask an architect whether the design needs notices, and see our page on party wall services for the surveyor side.
How do the RIBA stages apply to an extension?
RIBA, the architects' professional body, describes an architect's work in stages and says invoices may be monthly or sent at the end of stages. Its homeowner guidance groups them as stages 0 to 3 (feasibility studies, concept design and planning), stage 4 (technical design) and stages 5 and 6 (construction to handover) (RIBA). For a house extension that translates roughly as follows.
- Stages 0 to 3: a measured survey, two or three layout options, a chosen scheme and the planning route, ending with a submitted application or notice.
- Stage 4: the building regulations drawings, coordination with the structural engineer and a specification a builder can price.
- Stages 5 and 6: tender and appointment of a contractor, visits during the build and a handover snagging list. Not every client buys this part.
How are architect fees structured for an extension?
RIBA lists three ways to set a fee: a percentage of construction cost, a lump sum, or a time charge, and says they can be mixed by stage (RIBA). Our guide to how architect fees work goes through each. For an extension the useful question is what the number covers. Check whether it includes the survey, the planning application, the building regulations package, the engineer, and visits on site. Council fees (£548 for a householder application, £249 for prior approval) are paid to the council and are separate from what the architect charges (Planning Portal). We do not quote typical fees here because no primary source publishes one for this kind of job. Get written quotes on the same brief and compare like with like.
What should you ask an architect before hiring them?
- Which approval route do you expect my extension to take, and why?
- Does your fee include the survey, the planning application and the building regulations drawings?
- Who arranges and pays for the structural engineer?
- Will you tell me if a party wall notice is likely to be needed?
- Do you offer the build stage, and what would it cost on top?
- What happens to the fee if the design changes after I have approved it?
- Can I see two similar extensions you have designed, and speak to a past client?
- Do you hold adequate professional indemnity insurance? The ARB checklist says your terms of engagement should confirm adequate cover.
- Will the person I meet be the person doing the work?
How do you check your extension architect is registered?
- Ask for the architect's ARB registration number. The Architects Registration Board says every architect has a unique number and can give it to you on request.
- Go to arb.org.uk and search the Architects Register by number, name or registered business address.
- If you cannot find the person using the details they gave you, the ARB's guidance is that they are not an architect.
- Repeat the check for anyone else who will be working on your drawings.
ARB says it is a criminal offence to use the title in business or practice without being listed (ARB). When you are ready to compare practices, you can browse architects by city, read the guides for background, or look at the related page on planning applications. Adding a floor rather than a room? See loft conversions.
Find extensions architects near you
Questions people ask
Do I need an architect for a house extension?
No rule says you must. You can use an architect, an architectural technologist or a design-and-build firm. An architect is worth considering when the layout is awkward, the land is designated or you want help with approvals and tendering. Whoever you hire, confirm in writing which stages the fee covers.
How long does an architect take to design an extension?
It varies with the project, so ask for a programme in writing. The fixed points are outside the architect's control: building regulations full plans are decided within five weeks (two months by agreement), and a party wall notice must be served at least two months before work to a shared wall.
Can an architect get planning permission for my extension?
An architect can prepare and submit the application or prior approval notice and respond to the council's questions. No one can guarantee the outcome, because the council decides. In England the council fee is £548 for a householder application and £249 for prior approval of a larger rear extension, paid separately.
What is the difference between planning permission and building regulations?
Planning decides whether the building is acceptable in principle and how it looks. Building regulations check how it is constructed, including structure, insulation and drainage. They are separate approvals with separate fees, and an extension that needs no planning application will still normally need building regulations approval.
How do I know an architect is genuine?
Search the Architects Register on the ARB website using their registration number, name or business address. If they cannot be found by the details they gave you, ARB says they are not an architect. Using the title in business without being registered is a criminal offence.
Sources
- Extensions: planning permission (Planning Portal, opened 13 October 2026)
- Extensions: prior approval (Planning Portal, opened 13 October 2026)
- A guide to fees for planning applications in England (1 April 2026) (Planning Portal, opened 13 October 2026)
- Full plans (Planning Portal, opened 13 October 2026)
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 1 (legislation.gov.uk, opened 13 October 2026)
- The Party Wall etc. Act 1996: explanatory booklet (GOV.UK, opened 13 October 2026)
- Checklist before hiring an architect (Architects Registration Board, opened 13 October 2026)
- Public information (Architects Registration Board, opened 13 October 2026)
- How do architects calculate their fees? (RIBA, opened 13 October 2026)
Rules and fees change, so check the linked page before you rely on a figure. Most planning and building rules here are for England; Wales, Scotland and Northern Ireland differ. This page is general information, not professional advice. Hero photo: Photographer: Ben Wicks. Photo page on Unsplash (Unsplash License (free to use), as stated on the photo page on 13 October 2026.).