Planning application architects

A planning application asks your local planning authority for permission to build, change or use land in a particular way. An architect prepares the drawings and supporting documents, submits them, answers the case officer and advises you if the decision goes the wrong way.

Get a quote

You choose one practice to send this to. We never pass it to anyone else.

We use these details only for this request and email you a short confirmation. See our privacy notice.

Checked against the linked sources on 13 October 2026 · England, fees in force from 1 April 2026

Planning permission is the council's consent, under the Town and Country Planning system, for development that is not already allowed by national rules. In England the decision is made by the local planning authority, which is usually the district, borough or unitary council. Planning applications are only one part of a project: building control and party wall matters run on their own tracks. This page covers England; Wales, Scotland and Northern Ireland have separate systems and fees.

What types of planning application are there?

Choosing the correct route comes first, because it sets the fee, the paperwork and the decision period. An architect or planning consultant will usually confirm the route before drawing anything for submission.

ApplicationWhat it coversFee
HouseholderExtensions, alterations and outbuildings for a single house (not flats)£548; £272 for ancillary buildings and boundary enclosures
FullA complete design for a new building, change of use or other development£610 per new dwelling for fewer than 10 homes
OutlineWhether the principle of development is acceptable, with details held back£610 per 0.1 hectare for a dwelling site under 0.5 hectares
Reserved mattersThe details the outline left open, such as layout, scale and landscaping£610 if the full fee was already paid
Lawful development certificateConfirms a use or works is lawful, or that proposed works need no permissionSame as full (existing); half of full (proposed)
Discharge of conditionsApproval of details a condition requires before work can proceed£89 householder; £309 other
Common application types and fees in England from 1 April 2026.

Prior approval and listed building consent sit alongside these. Prior approval is a shorter check for certain permitted development rights, and listed building consent is a separate application for work to a listed property, covered on our listed buildings page. A lawful development certificate is worth considering when you believe the work needs no permission and want proof to hand to a buyer or solicitor (Planning Portal, lawful development certificate).

How much does a planning application cost?

The council's fee is fixed in regulations and is the same whoever submits the application. The fees in the table come from the Planning Portal guide that applies from 1 April 2026, which is based on the 2012 fees regulations as amended (Planning Portal fee guide). Where an application covers more than one category of development, the total may not simply be the sum of the category fees, so ask your council to confirm. Online submissions through the Planning Portal also carry a separate service charge for fees over £100 (Planning Portal, what it costs).

The architect's fee, surveys and specialist reports are on top. Those depend on the site and the council's requirements, so get written quotes for the same scope. Our guide to how architect fees are calculated sets out the methods and what sits outside them.

How long does the council have to decide a planning application?

The clock starts when the council has a valid application. GOV.UK sets the statutory periods at 8 weeks for most applications, 13 weeks for major development and 16 weeks where an Environmental Impact Assessment applies. A longer period is possible only by agreement in writing with the timescale set out (GOV.UK, determining a planning application). For a large or complex scheme, the guidance suggests considering a planning performance agreement before submission.

If a valid application is not decided within the period, you have a right to appeal against non-determination to the Secretary of State. Many applicants agree an extension and keep talking to the case officer instead, because an appeal moves the decision to the Planning Inspectorate. Your architect should tell you which choice suits your timetable.

Is pre-application advice worth paying for?

Often it is, especially for a new house, a site in a conservation area or anything the council could see as a departure from policy. GOV.UK says pre-application engagement has significant potential to improve both the efficiency and effectiveness of the planning system and can reduce delay at the validation stage (GOV.UK, before submitting an application). Councils can charge for discretionary pre-application services, but the charge must not exceed the cost of providing the service, and they are strongly encouraged to offer a basic service for free.

Pre-application feedback is an officer's view at that moment, not a decision. It does not bind the council, and a committee or a later case officer can reach a different conclusion. Use the written response to shape your drawings and to explain, in the application, how you have dealt with each point.

Planning applications in numbers

WhatFigureSource
Householder planning application fee£548 (£272 for ancillary buildings and boundary enclosures within a dwellinghouse's boundary)Planning Portal, A guide to fees for Planning Applications in EnglandFees apply from 1 April 2026
Full application fee for erecting fewer than 10 dwellinghouses£610 for each dwellinghouse; £659 each for 10 to 50Planning Portal, A guide to fees for Planning Applications in EnglandFees apply from 1 April 2026
Lawful development certificate feesExisting use: same as the full application fee. Proposed use or operation: half the full application feePlanning Portal, A guide to fees for Planning Applications in EnglandFees apply from 1 April 2026
Discharge of conditions fee for householder development£89 (£309 for any other development)Planning Portal, A guide to fees for Planning Applications in EnglandFees apply from 1 April 2026
Statutory period to decide an application other than major development8 weeksGOV.UK, Determining a planning applicationArticle 34 of the 2015 Order, as amended; page as read 13 October 2026
Statutory period to decide major development13 weeks (16 weeks where an Environmental Impact Assessment applies)GOV.UK, Determining a planning applicationArticle 34 of the 2015 Order, as amended; page as read 13 October 2026
Reserved matters decision period8 weeks from validation, up to 13 weeks for larger developmentsPlanning Portal, Reserved mattersPage as read 13 October 2026
Right to appeal against non-determinationAvailable once the statutory or agreed period has passed without a decisionGOV.UK, Determining a planning applicationPage as read 13 October 2026
Time to appeal a refusal12 weeks from the decision notice for a householder or minor commercial refusal; 6 months for most other refusals and for conditions you object toGOV.UK, Planning appeals: procedural guide (applications dated on or after 1 April 2026), section 4Guide as read 13 October 2026; 28 days where an enforcement notice has been served
Councils' charges for pre-application adviceMust not exceed the cost of providing the service; councils are encouraged to offer a basic level freeGOV.UK, Before submitting an applicationPlanning practice guidance as read 13 October 2026
Red-brick English family house with a driveway and a parked car in Farnham, Surrey
A family home in Farnham, England. Stock photo from Pexels. Photographer: Ryan Collis. Photo page on Pexels (Pexels Licence (free to use). Photo page read 13 October 2026.).

What must a valid planning application include?

An application is valid only when it has a completed form, meets the national information requirements, includes the correct fee and any local requirements on the council's published list (GOV.UK, making an application). The national requirements include a location plan and other plans drawn to an identified scale, an ownership certificate with an agricultural land declaration, and a design and access statement for some applications. A fire statement is required for some applications made on or after 1 August 2021.

  • Application form completed for the right application type, signed and dated.
  • Location plan drawn to an identified scale, with the site clearly marked.
  • Existing and proposed plans, elevations and sections, plus a block or site plan where the council asks for one.
  • Ownership certificate, and notice to other owners or agricultural tenants where this applies.
  • Correct fee, paid with the submission.
  • Any local list items, such as ecology, flood risk, heritage or transport statements.

What can I do if my application is refused?

A refusal is not always the end. Read the officer's report and decision notice, then choose between amending the scheme and resubmitting, or appealing. The Planning Inspectorate handles planning appeals in England (GOV.UK, Planning Inspectorate). GOV.UK says you can appeal if you were refused or granted with conditions you object to, or if the council has not decided within the relevant period, and that you can apply for costs if the council behaved unreasonably (GOV.UK, appeal a planning decision).

The Planning Inspectorate's procedural guide gives 12 weeks from the decision notice to appeal a householder refusal, such as an extension or loft, and 6 months for most other refusals or for conditions you object to. The limit drops to 28 days where an enforcement notice has been served (GOV.UK, planning appeals procedural guide; GOV.UK, how long you have to appeal). Deadlines depend on the case type and the date of the application, so read your decision letter and check the current guidance before the date passes. An architect can tell you whether the reasons for refusal can be met with a revised scheme, which is often faster than an appeal.

What does an architect submit and do on your behalf?

  1. Check the site: planning history, constraints such as conservation areas, flood zones and trees, and any permitted development rights.
  2. Advise on the route: householder, full, outline, prior approval or a lawful development certificate.
  3. Request pre-application advice where it is worth the fee, and respond to what officers say.
  4. Prepare the drawings, design and access statement and any other documents the council lists as required.
  5. Submit the application, usually through the Planning Portal, and pay the fee on your behalf if you ask.
  6. Deal with the case officer during the decision period, answering consultee comments and amending where it helps.
  7. Discharge conditions after approval, and advise on a refusal or appeal.

You can be named as the applicant, with the architect as agent. The council will then write to the agent, so make sure the architect keeps you copied in. For help on a particular project type, read our pages on extensions and loft conversions.

What should I ask an architect before they submit an application?

  • Which application type do you recommend and why?
  • What is included in your fee: drawings, statements, submission, negotiation and conditions?
  • Who pays for surveys and specialist reports if the council asks for them?
  • How many revisions are included if the officer asks for changes?
  • Will you recommend pre-application advice, and what will it cost?
  • What will you do if the application is refused?

How do I check the architect submitting my application is registered?

  1. Open the Architects Register run by the Architects Registration Board.
  2. Search the person's name and confirm the registration number and that they are listed.
  3. See the ARB public information page, which says using the title architect in business without registration is a criminal offence.
  4. Find practices through our city pages and send an enquiry to the one you choose.

Find planning applications architects near you

Get a quote

You choose one practice to send this to. We never pass it to anyone else.

We use these details only for this request and email you a short confirmation. See our privacy notice.

Questions people ask

How much is a planning application in England?

From 1 April 2026 a householder application costs £548, and a full application for a single new dwelling costs £610 on the Planning Portal's fee guide. Other types, such as outline, prior approval and lawful development certificates, have their own fees. Check the exact figure for your project with the council or the Planning Portal.

How long does a planning application take?

The statutory period is 8 weeks for most applications and 13 weeks for major development, counted from when the application is valid. The council can ask you to agree a longer period in writing. If it does not decide in time, you can appeal for non-determination.

Do I need an architect to submit a planning application?

No law requires it. You can apply yourself through the Planning Portal. An architect or planning agent is useful where drawings must be accurate to scale, the site is constrained or the council is likely to ask for supporting statements. Only someone on the ARB register may call themselves an architect in business.

What happens if my planning application is invalid?

The council will not start the decision period until the missing items are supplied. Common gaps are the ownership certificate, a correct location plan or the fee. If you think the council is wrong, you can serve an article 12 notice. Check the council's local validation list before you submit.

Can I appeal a planning refusal?

Yes. You can appeal to the Planning Inspectorate if you are refused, or granted with conditions you object to. A householder refusal must be appealed within 12 weeks of the decision notice; most other refusals allow 6 months. Deadlines vary by case type, so check the current guidance and your decision letter before relying on a date.

Is pre-application advice binding on the council?

No. It is the officer's view at the time and does not commit the council to approving a later application. It still helps you spot issues, shape the design and explain your reasoning in the submission. Councils may charge for it, but only up to the cost of providing it.

Sources

  1. A guide to fees for Planning Applications in England (from 1 April 2026) (Planning Portal, opened 13 October 2026)
  2. What it costs (Planning Portal, opened 13 October 2026)
  3. Reserved matters (Planning Portal, opened 13 October 2026)
  4. Lawful development certificate (Planning Portal, opened 13 October 2026)
  5. Determining a planning application (GOV.UK, opened 13 October 2026)
  6. Making an application (GOV.UK, opened 13 October 2026)
  7. Before submitting an application (GOV.UK, opened 13 October 2026)
  8. Appeal a planning decision (GOV.UK, opened 13 October 2026)
  9. How long you have to appeal (GOV.UK, opened 13 October 2026)
  10. Planning appeals: procedural guide (applications dated on or after 1 April 2026) (GOV.UK, opened 13 October 2026)
  11. Planning Inspectorate (GOV.UK, opened 13 October 2026)
  12. Architects Register (Architects Registration Board, opened 13 October 2026)
  13. Public information (Architects Registration Board, opened 13 October 2026)

Rules and fees change, so check the linked page before you rely on a figure. Most planning and building rules here are for England; Wales, Scotland and Northern Ireland differ. This page is general information, not professional advice. Hero photo: Photographer: Ryan Collis. Photo page on Pexels (Pexels Licence (free to use). Photo page read 13 October 2026.).