Planning application architects in London: dealing with 33 authorities

A London planning application goes to one of 33 authorities, each with its own register, local requirements and design policies. In the year to June 2026 those authorities decided 23,967 householder applications and granted 85.8% of them.

Get a quote

You choose one practice to send this to. We never pass it to anyone else.

We use these details only for this request and email you a short confirmation. See our privacy notice.

London at a glance

Planning decisions are made by 32 London borough councils + the City of London Corporation (33 local planning authorities). London has 33 planning authorities (32 boroughs and the City of London); the planning figures below add them together.

Householder planning decisions (12 months)
23,967
MHCLG, 1 July 2025 to 30 June 2026 (four quarters)
Householder applications granted
85.8%
MHCLG, 1 July 2025 to 30 June 2026 (four quarters)
Householder decisions made in time (our calculation from the published counts)
93.5%
MHCLG, 1 July 2025 to 30 June 2026 (four quarters)
Average house price
£550,037
HM Land Registry / ONS, July 2026
Homes built before 1919
28.9%
Valuation Office Agency, 31 March 2026 (England and Wales Council Tax valuation lists)
Population
9,122,909
ONS, mid-2025 (30 June 2025)

Checked against the linked sources on 14 October 2026 · London (England), statistics to June 2026; council pages read 14 October 2026

A planning application is the formal request to your council for permission to build or change something. In London that council is one of 33, and the way you find, track and argue your case differs from one to the next. This page walks through the London-specific steps. For the general process see our planning applications page, and for the borough picture see the London hub guide.

Where do you start with 33 different councils?

Confirm your authority from your postcode with GOV.UK's council finder. Some London addresses sit on a borough boundary, and a street can change authority at a junction, so check the property itself. Then open that borough's planning pages and look for four things: the online application register, the list of conservation areas, any Article 4 directions, and the validation requirements for your type of application. Our guide to finding your local planning authority covers the national steps.

The Mayor's London Plan sits above the borough policies, and its small-sites policy, for sites under 0.25 hectares, is relevant when an application adds homes (London Plan 2021, chapter 4). For most householders it is background. The borough's own Local Plan and design guidance carry the weight.

What do London's decision figures mean for your chances?

They give context, not a forecast. London's authorities decided 23,967 householder applications between July 2025 and June 2026 and granted 85.8% (MHCLG). Because those are pooled across 33 authorities, a single borough's rate can differ widely. What improves your odds is a scheme that follows the borough's own guidance, which is why architects read the officer reports on recent decisions in the same street before they draw.

StepWhat happensLondon check
Identify the authorityConfirm which of the 33 councils covers the addressBoundary streets and estates
Check designationsConservation area, Article 4 direction, listed statusBorough maps and Article 4 datasets
Optional pre-application adviceWritten or meeting-based advice for a fee in many boroughsWhat the advice includes and how it is recorded
Validation and submissionApplication, drawings and fee sent through the Planning Portal or the councilThe borough's local validation list
Consultation and decisionNeighbours are notified; the officer reports; a decision follows8 weeks, unless extended in writing
Steps in a London householder application, with what to check at each

How do Article 4 directions and conservation areas shape an application?

They decide whether you need an application at all. Islington says it has removed permitted development rights in 40 of its 42 conservation areas (Islington). Haringey describes four directions within conservation areas (Haringey). Lambeth lists nine areas and publishes its directions as downloadable data (Lambeth). The works restricted differ by direction, so open the direction document for your area, not only the summary page.

Is pre-application advice worth paying for in London?

It can be, for a scheme that pushes against guidance, such as a deep extension, a basement or a roof alteration in a conservation area. What the council provides varies. Richmond upon Thames, for example, offers a charged written service for householders with non-listed homes, and its page says it does not include an officer meeting (Richmond). Ask any borough how long the advice takes, who writes it and whether it is recorded on the file. Advice is not binding, so treat it as an early signal.

Planning applications in London: the figures

WhatFigureSource
Householder decisions across London's 33 authorities23,967 in the year to 30 June 2026MHCLG, Live tables on planning application statistics: District planning application statistics (PS2), last 4 quarters to 30 June 20261 July 2025 to 30 June 2026; published 24 September 2026
Share of those decisions granted85.8%MHCLG, Live tables on planning application statistics: District planning application statistics (PS2), last 4 quarters to 30 June 20261 July 2025 to 30 June 2026; our calculation from the published counts
Householder decisions made in time93.5% within 8 weeks or an agreed extended timeMHCLG, Live tables on planning application statistics: District planning application statistics (PS2), last 4 quarters to 30 June 20261 July 2025 to 30 June 2026; our calculation from published counts, not a headline MHCLG measure
Statutory decision period for householder-type applications8 weeks, unless a longer period is agreed in writing with the applicantGOV.UK, Determining a planning applicationGuidance read 14 October 2026
Planning fee for altering or extending one home in England£548 for a householder application on a single house, and £548 for a full application to alter a single flatPlanning Portal, Application fees for EnglandApplies from 1 April 2026
Time to appeal a refusal12 weeks for a householder refusal; 6 months for most other refusals and for conditions; 28 days where an enforcement notice has been servedPlanning Inspectorate, Procedural guide for appeals on applications dated on or after 1 April 2026Page read 14 October 2026
Islington conservation areas with Article 4 directions40 of 42London Borough of Islington, Permitted developmentPage read 14 October 2026
Lambeth Article 4 direction dataDownloadable dataset of directions and their areas, plus nine conservation areas with directionsLondon Borough of Lambeth, Article 4 directionsPage read 14 October 2026
Richmond upon Thames householder pre-application adviceCharged written advice for non-listed homes, with no officer meetingLondon Borough of Richmond upon Thames, Pre-application advicePage read 14 October 2026

What will the council ask you to submit?

A valid application needs the national documents, and a council may add its own local list of requirements. For a householder scheme that usually means existing and proposed plans, elevations and sections, a site location plan, an ownership certificate and the fee. A borough may also ask for extra material when the property is in a conservation area, near trees or in a flood zone, and for basements it can require engineering reports. Read the list on the borough's website before you brief the drawings, because an application that lacks something is held as invalid and the clock does not start.

How do you follow your application once it is in?

Each borough has an online register where the case officer's name, the consultation dates and the comments appear. Check it weekly. Neighbours' comments are public there, and answering a concern promptly, with a revised drawing if needed, usually matters more than waiting for the deadline. If the officer asks for changes, your architect should tell you what the revision costs and whether to agree an extension in writing, so that a refusal does not arrive at the end of the eight weeks.

What does it cost and how long does it take?

The householder application fee for a single dwelling is £548 from 1 April 2026 (Planning Portal). It does not cover drawings, reports or specialist consultants. Councils are expected to decide within 8 weeks unless you agree a longer period in writing (GOV.UK). In London we calculate 93.5% of householder decisions were made within 8 weeks or an agreed extension in the year to June 2026, though that sum hides slower and faster boroughs.

What if the council refuses?

You can usually amend and resubmit, or appeal. The Planning Inspectorate allows 12 weeks from the decision notice to appeal a refused householder application, such as a rear extension on a Hackney terrace, and 6 months for most other refusals or for conditions (Planning Inspectorate). If the council has served an enforcement notice on the same development, that window can shrink to 28 days. Read the reasons for refusal against the borough's cited policies, because that tells you whether a redesign or an appeal is the better route. An architect who knows the borough's officers and committee can often judge that quickly.

What should you ask an architect before they submit?

  • Which policies and guidance documents from my borough will the officer use to judge this scheme?
  • Do you recommend pre-application advice, and what would it cost and cover?
  • Who prepares the validation documents, such as plans, design and access statement or technical reports?
  • How do you handle neighbour objections and officer queries during the 8-week period?
  • Are council fees, consultants and a lawful development certificate included in your quote or extra?

Check each name on the ARB register of architects before you appoint, and compare written quotes that cover the same scope. For fee structures, see our guide to what architects charge.

Questions people in London ask

Where do I submit a planning application in London?

You apply to the borough council that covers the property, or to the City of London Corporation in the Square Mile. Most applications go through the Planning Portal or the borough's own site. There is no single London system, so confirm your authority from your postcode and read its validation requirements before submitting.

How long does a London planning decision take?

The statutory period for most householder applications is 8 weeks, unless you agree a longer period in writing. We calculate that 93.5% of London's householder decisions in the year to June 2026 were made in 8 weeks or an agreed extension. Larger schemes follow different time limits.

How much does a householder planning application cost in London?

The fee is set nationally: £548 for a single dwelling in England from 1 April 2026, whichever London borough you apply to. You pay separately for drawings, consultants and any optional pre-application advice, which many boroughs charge for. Ask your council for its current charges.

What is an Article 4 direction and how do I find one?

It is an order that removes certain permitted development rights in a defined area, so work that would not normally need permission does. Borough websites list them, often with maps or downloadable data, as Lambeth does. If your street is in a conservation area, check for a direction too.

Can I appeal a refused planning application in London?

Yes, but watch the clock: a refused householder application must be appealed within 12 weeks of the decision notice, while most other refusals and appeals against conditions allow 6 months, and only 28 days may apply if an enforcement notice is in play. Read the reasons for refusal first, because an amended resubmission is sometimes quicker than an appeal. Keep the decision notice and the officer's report.

Sources

  1. Live tables on planning application statistics (PS2) (MHCLG, opened 13 October 2026)
  2. Application fees for England, from 1 April 2026 (Planning Portal, opened 14 October 2026)
  3. Determining a planning application (GOV.UK, opened 14 October 2026)
  4. Procedural guide: planning appeals (applications dated on or after 1 April 2026) (Planning Inspectorate, opened 14 October 2026)
  5. Permitted development (London Borough of Islington, opened 14 October 2026)
  6. Article 4 directions (London Borough of Haringey, opened 14 October 2026)
  7. Article 4 directions (London Borough of Lambeth, opened 14 October 2026)
  8. Pre-application advice (London Borough of Richmond upon Thames, opened 14 October 2026)
  9. The London Plan 2021, chapter 4: Housing (Greater London Authority, opened 14 October 2026)
  10. Find your local council (GOV.UK, opened 14 October 2026)

Rules and fees change, so check the linked page before you rely on a figure. Most planning and building rules here are for England; Wales, Scotland and Northern Ireland differ. This page is general information, not professional advice.