A World Heritage Site is treated like a conservation area for permitted development, so a side extension or a rear extension of more than one storey in Bath needs a planning application. The council granted 97.1% of the 771 householder decisions it made across its district in the year to June 2026.
Bath at a glance
Planning decisions are made by Bath and North East Somerset Council. The figures below cover the whole Bath and North East Somerset council area, not the city of Bath alone.
- Householder decisions made in time (our calculation from the published counts)
- 88.1%
- MHCLG, 1 July 2025 to 30 June 2026 (four quarters)
- Homes built before 1919
- 28.9%
- Valuation Office Agency, 31 March 2026 (England and Wales Council Tax valuation lists)
Checked against the linked sources on 14 October 2026 · Bath and North East Somerset Council area, England; figures to June 2026, council pages read 14 October 2026
Which Bath extensions can go ahead without an application?
Schedule 1 of the permitted development order names a World Heritage Site next to conservation areas as "article 2(3) land" (legislation.gov.uk), and the Planning Portal sets out what that removes (Planning Portal). Within Bath's designated areas, much of what a household might build at the back or side therefore needs a householder application. The table compares the two situations for an ordinary house, not a flat or a listed building.
| Extension | Outside article 2(3) land | Inside a World Heritage Site or conservation area |
|---|---|---|
| Single-storey rear, up to 3m (4m detached) | Permitted development if every other limit is met | Same base limit; check cladding and materials |
| Single-storey rear, 3m to 6m (4m to 8m detached) | Prior approval route, with neighbours consulted | Not available |
| Side extension | Single storey only, up to half the house width | Always needs householder permission |
| Rear extension of two storeys | Up to 3m, under further conditions | Always needs householder permission |
| Cladding the exterior | Allowed if materials look similar to the existing house | Not permitted development |
Do not stop at the national table. A house can also lose rights through a planning condition on an earlier consent or an Article 4 direction. The council's planning check page says a proper check covers national rules, its constraints map and the property's planning history, and that it will certify the answer if you apply for a Certificate of Proposed Lawful Use. Flats, converted houses and listed buildings follow different routes; our national page on house extensions covers the general rules.
How should a Bath extension look next to its neighbours?
The council's city-wide appraisal, adopted on 31 August 2005, describes a limited palette of Bath stone, Welsh slate, painted iron and painted timber and notes that regular course heights of 14 or 12 inches are fundamental to how the stone is laid (character appraisal). It also records that some back and side walls are coursed rubble, much of it originally lime rendered. That matters at the rear of a terrace, where the new wall is often the one you will see most.
The same appraisal describes modern buildings with deep plans, large unbroken roof expanses and flat roofs as often out of character. Read that as a prompt to test any rear addition for depth and roof form. Ask your architect to show how the extension's stone coursing, window proportions and parapet or eaves line relate to the original, and how the join will look from the street if it can be seen.
What changes on a Bath slope or above a vault?
The appraisal says much of the city's 18th and early 19th century building stands on vaults, roughly four to five metres above the natural ground level, to avoid costly excavation. The council's guidance on historic vaults says they usually sit beneath the highway to the front, were never intended for habitation, and should not be regarded as potential habitable space (historic vaults guidance). A basement or lower-ground extension to a listed terrace is therefore a heritage question first and a construction question second.
Steep plots raise a drawing issue too. The council's drawing standards ask for sections showing how proposals relate to existing ground levels on sloping sites, and for a street scene or context plan where works will be visible from the road (drawing standards, June 2023).
What does the council expect in the application?
For a householder application the council's checklist says you may need a biodiversity and geological conservation assessment, a flood risk assessment, and parking and access arrangements set out in a design and access statement (householder checklist). If the house is listed, a heritage statement joins the list.
The drawing standards are strict about presentation:
Extensions in Bath: the figures
| What | Figure | Source |
|---|---|---|
| Householder decisions, Bath and North East Somerset, and share granted | 771 decisions, 97.1% granted | MHCLG, Live tables on planning application statistics: PS2, last four quarters to 30 June 20261 July 2025 to 30 June 2026 (four quarters); published 24 September 2026; whole district |
| Council Tax homes built before 1919 | 28.9% of the stock | Valuation Office Agency, Council Tax: stock of properties 2026, Table CTSOP4.031 March 2026; published 24 September 2026; whole district |
| World Heritage Site in the permitted development order | Listed as article 2(3) land, alongside conservation areas | legislation.gov.uk, Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 1 Part 1Revised text as shown 14 October 2026 |
| Side extensions on article 2(3) land | All need householder planning permission | Planning Portal, Extensions: planning permissionPage read 14 October 2026 |
| Pre-application advice, extension to your own home | £163 (plus £76 for a meeting); 20 working days | Bath and North East Somerset Council, Pre-application advice and Development Team (service level 1)Fees from 1 April 2026, page read 14 October 2026 |
| Building control charge, extension up to 40m2 | £580 plus VAT (£696 total) | B&NES Building Control, Building Control fees and charges (Table B)Fees table read 14 October 2026 |
| Building control charge, extension 60m2 to 80m2 | £820 plus VAT (£984 total) | B&NES Building Control, Building Control fees and charges (Table B)Fees table read 14 October 2026 |
| Trees in conservation areas | Trunk diameter of 75mm or more protected; notify six weeks before work | Bath and North East Somerset Council, Conservation areas and planning restrictionsCouncil page read 14 October 2026 |
| Appeal deadline after a householder refusal | 12 weeks from the decision notice | Planning Inspectorate, Planning appeals procedural guide (applications dated on or after 1 April 2026)Guide read 14 October 2026 |
- plans must be drawn to a stated metric scale such as 1:100 or 1:50, and drawings marked 'not to scale' or 'do not scale' are not accepted;
- existing and proposed drawings are best shown side by side at the same scale;
- each sheet needs a title box with address, proposal, drawing title, date, scale and number;
- files go in as PDFs under 10 megabytes each, with names that say what they show;
- drawings that lack detail make the application invalid, which delays registration.
Many of these points sound pedantic until a validation officer returns an application for a missing scale bar. A practice that prepares drawings to the council's published standard saves that round trip.
What does Bath building control charge for an extension?
B&NES Building Control publishes its table of charges (fees and charges). For extensions it lists £580 plus VAT up to 40m2 (£696 in total), £730 plus VAT from 40m2 to 60m2 (£876), and £820 plus VAT from 60m2 to 80m2 (£984). Floor area means the total internal floor area of all storeys, and larger extensions are quoted individually. If you apply for a loft conversion at the same time, the table reduces the loft charge by 25%.
These charges cover plan checking and inspection by the council's team. A private registered building control approver is another route, so compare what each quote includes before choosing. Terrace and semi-detached extensions will probably also need a party wall notice, which is separate from both planning and building control; see our guide to party wall agreements.
Is paying for pre-application advice worth it?
Level 1 of the council's pre-application service covers extensions to your own home. It costs £163, or £239 with a meeting, takes 20 working days and includes a site visit and a written report (pre-application advice). The council says the service gives a qualified opinion on whether a scheme is likely to be permitted, and flags issues early. It adds that pre-application advice does not guarantee approval and is not published on the planning register.
Treat it as a test of the design, not a formality. It is most useful where permitted development has gone, the plot is steep, a tree is close or the house is listed. For a listed building the council's schedule moves to higher levels, starting at £445 for a minor extension; see listed building work in Bath.
What if the council refuses?
The Planning Inspectorate's procedural guide gives 12 weeks from the date on the decision notice to appeal a refused householder application (procedural guide). That limit drops to 28 days if an enforcement notice has been served on the same or very similar development. Appeals on applications made from 1 April 2026 normally follow the Part 1 written procedure, where you cannot add evidence the council did not see unless circumstances have materially changed, so a missing report is better fixed in a fresh application. The council's guide to the decision process offers appeal or an amended resubmission, and recommends its pre-application service before resubmitting.
What should you ask a Bath extension architect?
- Is my address inside the World Heritage Site, a conservation area or an Article 4 area, and how does that change the route?
- Will you speak to the council before we apply, and who attends?
- Which similar Bath stone or rendered-rubble extensions have you taken through the council?
- Does your fee include drawings in the council's published standard and the heritage statement if one is needed?
- Who coordinates building control, structural design and the party wall notice?
Check registration on the ARB register before you sign anything, and compare written quotes against one brief. The planning picture for the wider area is on the Bath hub page, and loft conversions in Bath cover the roof.
Questions people in Bath ask
Do I need planning permission for a house extension in Bath?
Often yes. A World Heritage Site and a conservation area are both article 2(3) land, where every side extension and every rear extension of more than one storey needs householder permission. A smaller single-storey rear extension may still qualify, so check the council's constraints map before assuming either way.
Can I use the 6 metre or 8 metre rear extension rule in Bath?
Not on article 2(3) land. The Planning Portal says the larger single-storey rear extension route, which needs prior approval, does not apply in a conservation area or World Heritage Site. Outside those areas it may be available, subject to neighbour consultation and the council's decision.
How much does building control cost for an extension in Bath?
B&NES Building Control lists £580 for an extension up to 40m2, £730 for 40m2 to 60m2 and £820 for 60m2 to 80m2, each plus VAT, with floor area counted across all storeys. Larger extensions are quoted individually. The charge is separate from planning fees and from your architect's fee.
How much is pre-application advice for an extension in Bath?
Level 1 costs £163 from 1 April 2026, or £239 if you add a meeting, and the council gives 20 working days. It includes a site visit and a written report. The advice is not a guarantee, and it is not published on the planning register.
How long do I have to appeal a refused extension in Bath?
For a refused householder application in England the Planning Inspectorate gives 12 weeks from the date on the decision notice. An appeal against conditions you object to has 6 months. Ask your architect to check the notice date straight away, because a missed deadline means the appeal will not be accepted.
Sources
- Live tables on planning application statistics (PS2) (MHCLG, GOV.UK, opened 14 October 2026)
- Council Tax: stock of properties, 2026 (Valuation Office Agency, opened 14 October 2026)
- Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 1 (legislation.gov.uk, opened 14 October 2026)
- Extensions: planning permission (Planning Portal, opened 14 October 2026)
- Extensions: prior approval (Planning Portal, opened 14 October 2026)
- Planning appeals: procedural guide (applications dated on or after 1 April 2026) (Planning Inspectorate, GOV.UK, opened 14 October 2026)
- Check if you need planning permission (Bath and North East Somerset Council, opened 14 October 2026)
- Stages of the planning decision making process (Bath and North East Somerset Council, opened 14 October 2026)
- Bath city-wide character appraisal (adopted 31 August 2005) (Bath and North East Somerset Council, opened 14 October 2026)
- Historic vaults in Bath (Bath and North East Somerset Council, opened 14 October 2026)
- Conservation areas and planning restrictions (Bath and North East Somerset Council, opened 14 October 2026)
- Householder application checklist (Bath and North East Somerset Council, opened 14 October 2026)
- Drawing standards: best practice for planning applications (June 2023) (Bath and North East Somerset Council, opened 14 October 2026)
- Pre-application advice and Development Team (Bath and North East Somerset Council, opened 14 October 2026)
- Building Control fees and charges (B&NES Building Control, opened 14 October 2026)
Rules and fees change, so check the linked page before you rely on a figure. Most planning and building rules here are for England; Wales, Scotland and Northern Ireland differ. This page is general information, not professional advice.