Rules called permitted development rights let you extend a house in England without a planning application, as long as specific limits and conditions are met. Go beyond them and you will most likely need householder planning permission. This guide follows the Planning Portal's summary of the limits (Planning Portal). It covers England only. The Planning Portal says policy in Wales may differ, and Scotland and Northern Ireland have their own systems, so ask your local planning authority there.
First check that permitted development applies to your home
The rules summarise Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015, as amended. They do not apply to:
- flats and maisonettes
- houses that were converted, or created through certain permitted development rights such as changes of use and new dwellinghouses
- other buildings
- areas where a planning condition, an Article 4 direction or another restriction limits or removes permitted development rights
An Article 4 direction is issued by a local planning authority. It removes some or all permitted development rights, for example in a conservation area or around a listed building. Your council can tell you whether one covers your street (Planning Portal).
Limits that apply to every extension
These conditions apply to every type of extension. They are measured against the original house. That means the house as first built, or as it stood on 1 July 1948. Earlier extensions count towards the limits, including ones a previous owner built. The list below is the Planning Portal's summary of the conditions (Planning Portal).
- Extensions and other buildings can cover no more than half the area of land around the original house.
- An extension cannot be higher than the highest part of the existing roof, or higher at the eaves than the existing eaves.
- Within two metres of a boundary, the eaves height cannot exceed three metres.
- It cannot be built forward of the principal elevation (the main front of the house) or, where the house fronts a highway, the side elevation.
- It cannot include verandas, balconies or raised platforms, a microwave antenna, a chimney, flue or soil and vent pipe, or any alteration to the roof of the existing house.
- Materials must look similar to those on the existing house.
Single-storey rear extensions
A single-storey rear extension cannot be more than four metres high. How far it can project from the original rear wall depends on the house type. It also depends on whether you use the prior approval route.
| House type | Standard limit | With prior approval |
|---|---|---|
| Detached | 4 metres | 8 metres |
| Any other house (semi-detached, terraced) | 3 metres | 6 metres |
Prior approval is not available on designated land or on a Site of Special Scientific Interest. You apply to the local authority, which consults the adjoining neighbours. If they object, the authority decides whether the effect on their amenity is acceptable (Planning Portal, prior approval). The application fee is £249 (fees guide).
As a worked example using only these limits: a semi-detached house on ordinary land wants a single-storey extension that goes 5 metres back. That is over the 3 metre standard limit and inside the 6 metre prior approval limit, so the prior approval route is the one to look at. At 7 metres it would need a full householder application.
Side extensions and extensions of more than one storey
A side extension that goes beyond the side elevation of the original house must meet three tests:
- a single storey only
- no more than four metres high
- no wider than half the width of the original house
All side extensions of more than one storey need householder planning permission (Planning Portal). An extension of more than one storey has its own limits:
- It must not extend more than three metres beyond the rear wall of the original house.
- It must not come within seven metres of any boundary opposite the rear wall.
- The roof pitch must match the existing house as far as practicable.
- Any upper-floor window in a side elevation must be obscure-glazed and non-opening, unless the opening part is more than 1.7 metres above the floor.
Conservation areas, National Parks and other designated land
The Planning Portal calls this Article 2(3) designated land (Planning Portal). It covers conservation areas, areas of outstanding natural beauty, areas specified by the Secretary of State to protect the countryside, the Broads, National Parks and World Heritage Sites. On that land:
- all side extensions need householder planning permission
- all rear extensions of more than one storey need householder planning permission
- the work cannot include cladding of the exterior
- prior approval for the larger single-storey rear extension is not available
Five checks before you rely on permitted development
- Is it a house, not a flat or maisonette?
- Is it free of planning conditions and Article 4 directions that remove the rights? Ask your council.
- Is it on designated land? If so, all side extensions and all rear extensions of more than one storey need householder planning permission, and prior approval is not available.
- Does the total, counting every earlier extension, stay within the half-the-land limit?
- Does each dimension stay within the limit for its type of extension?
When you do need to apply
If your plans go beyond any limit or condition, the Planning Portal says a householder application is likely to be required. In England the fee is £548 for an application to enlarge, improve or alter a single dwellinghouse (not flats), applying from 1 April 2026 (fees guide). You pay it to the council. It is separate from what you pay a designer or architect; our guide to what an architect costs explains how those fees work. A design change can sometimes bring a scheme back inside the limits, so it is worth asking an architect before you apply. You can browse architects who take on extensions in the directory.
Getting certainty with a Lawful Development Certificate
A Lawful Development Certificate is a legal document, granted by the local planning authority, stating that a proposal would be lawful. Apply for one when you are not sure whether a permitted development proposal is lawful. It is not a replacement for planning permission, and any development it does not cover still needs permission separately (Planning Portal). For a proposed use or operation the fee is half the full application fee (fees guide). If you are in London, FixedFeePlans, which is part of the same network as this site, lists certificate of lawfulness drawings from £950 on its price list as at 11 October 2026.
Planning permission is only one of the permissions
Even where no planning application is needed, other rules can still apply. Building regulations approval is a separate process, and the Planning Portal describes the building notice route as often used for alterations or extensions on a home (Planning Portal). The Party Wall etc. Act 1996 is also separate from planning permission and building regulations (GOV.UK); our loft conversion guide explains how its notices work. If the work adds over 100 square metres of floor space, it may also be liable for the Community Infrastructure Levy (Planning Portal).
Once you know what you are allowed to build, you can get prices against the same drawings. You can compare local builders on published prices and verified reviews.
Questions people ask
Can I use permitted development to extend a flat?
No. The Planning Portal says these rules apply to houses only, not to flats and maisonettes, so check with your local planning authority.
What counts as the original house?
The house as it was first built, or as it stood on 1 July 1948 if it was built before then. Earlier extensions, including those by previous owners, count towards the limits.
Does permitted development mean I can skip building regulations?
No. Building regulations approval is a separate process from planning permission, and the Party Wall etc. Act 1996 is separate from both.
Sources
- Extensions: planning permission · Planning Portal · read 11 October 2026
- Extensions: prior approval · Planning Portal · read 11 October 2026
- Lawful Development Certificate · Planning Portal · read 11 October 2026
- A guide to fees for planning applications in England (from 1 April 2026) · Planning Portal · read 11 October 2026
- Building notice · Planning Portal · read 11 October 2026
- Preventing and resolving disputes in relation to party walls · GOV.UK · read 11 October 2026
- FixedFeePlans price list · FixedFeePlans (same network as this site) · read 11 October 2026
- MyLocalBuilders.uk · MyLocalBuilders.uk (same network as this site) · read 11 October 2026
How we checked this
Every figure and rule in this post was read from the pages listed above on the dates shown. Where a source gives no figure, we say so instead of filling the gap. Rules change, so check the source before you commit money. If you spot an error, email [email protected] and we will check it against the source. More about us on the about page.
Written by the MyLocal Network editorial team. This is general information, not legal, planning or financial advice, and rules can change. This site is part of The MyLocal Network, and some posts link to other sites in it; those are editorial links, included only where they are useful to the reader.